Measure L Projects
Project Number |
Project Name | Project Description | Funding Source | Status |
---|---|---|---|---|
17-30 | W Main Corridor Rehabilitation Project Picture |
Road rehabilitation from Lander Ave to Walnut Rd | "Measure L / Fund 410 / Fund 411 / Fund 420" | Completed: NOC 10/13/20 |
20-001 | Southeast Quadrant Road Rehabilitation Project Picture |
"Street segments are listed below:
|
Measure L | Completed: NOC 6/28/2022 |
17-53 | Golden State Blvd Rehabilitation Project Picture |
Road rehabilitation between 20th Century Blvd. to Main St. | Federal Grant / Gas Tax / LTF / Measure L / Measure A | Completed: NOC 11/15/22 |
16-60 | Linwood Ave Pedestrian Improvements Project Picture |
From Lander Avenue to in front of Cunningham Elementary School | Measure L / Measure A / Federal Grant | Completed: NOC 9/13/22 |
18-53 | Intersection Improvements at Monte Vista and Fosberg Rd Project Picture |
Traffic signal and median at intersection of Monte Vista Ave and Fosberg Rd | Federal Grant / Measure L | Completed: NOC 3/8/22 |
16-57 | Intersection Improvements at Denair & Hawkeye Project Picture |
Traffic signal at intersection of Denair Ave and Hawkeye Ave | Federal Grant / Measure L | Completed: NOC 12/10/19 |
16-56 | Intersection Improvements at Lander Ave and F St Project Picture |
Traffic signal at intersection of Lander Ave and F St | Federal Grant / Measure L | Completed: NOC 3/8/22 |
18-54 | Intersection Improvements at Tully Rd and Tuolumne Rd | Traffic signal at intesection of Tully Rd and Tuolumne Rd | Federal Grant / Measure L | Completed: NOC 1/11/22 |
21-018 | Washington Rd Bridge Railing Repair | Repair damaged bridge railing on Washington Rd. | Measure L | 2023/24 Construction |
20-002 | Hedstrom Road Rehabilitation | Road rehabilitation between Geer Rd. to Colorado Ave. | Federal Grant / Measure L | Completed: NOC 9/27/22 |
20-003 | Northeast Quadrant Road Rehabilitation Project Picture |
Slurry seal treatment for street segments listed below:
|
Measure L | Completed: NOC 8/20/21 |
21-018 | Lander Ave Rehabilitation Project Picture |
Road rehabilitation between D Street to SR-99 | Measure L / Fund 420 | Complete; NOC 10/24/2023 |
20-038 | Signal Coordination (W. Monte Vista, Golden State, Geer Rd) | Replaces and installs new traffic signal controllers that can operate an efficient signal timing plan. | Federal Grant / Measure L | In Construction |
22-005 | Traffic Signal Synchronization on E. Monte Vista Ave | Replaces and installs new traffic signal controllers that can operate an efficient signal timing plan. | Federal Grant / Measure L | In Construction |
21-021 | Pedras Road Rehabilitation | Road rehabilitatoin between Geer Rd. to Golden State Blvd. | Measure L / Federal Grant | 2023/24 Construction |
14-44 | Intersection Improvements at Main and Tegner Rd | Traffic signal at intersection of W. Main St and Tegner Rd | Measure L | 2022/23/24 Design |
20-038 | Southwest Quadrant Road Rehabilitation | "Street segments are listed below:
|
Measure L | 2023/24 Construction |
21-022 | Road Rehabilitation Adjacent to County Islands | "County-led road rehabilitation project in select county islands adjacent to the City’s public right of way, as listed below:
|
Federal Grant / Measure L | Complete |