Measure L Projects


Project
Number
Project Name Project Description Funding Source Status
17-30 W Main Corridor Rehabilitation
Project Picture
Road rehabilitation from Lander Ave to Walnut Rd "Measure L / Fund 410 / Fund 411 / Fund 420" Completed: NOC 10/13/20
20-001 Southeast Quadrant Road Rehabilitation
Project Picture
"Street segments are listed below:
  • Pioneer Ave., entire length
  • Oak St., Cooper Ave. to Marshall St.
  • Oak St., 180’ south of Marshall St. to Marshall St.
  • Cahill Ave.
  • Rose St. to Oak St.
  • Marshall St.
  • Minaret Ave. to Bell St.
  • Sycamore St.
  • Minaret Ave. to Bell St.
  • Bell St.
  • Marshall Ave. to Sycamore St., Bell St.
  • Sycamore St. to East Ave.
  • Merritt St.
  • Minaret Ave. to Bell Ave.
  • Colorado Ave.
  • Marshall St. to East Ave.
Measure L Completed: NOC 6/28/2022
17-53 Golden State Blvd Rehabilitation
Project Picture
Road rehabilitation between 20th Century Blvd. to Main St. Federal Grant / Gas Tax / LTF / Measure L / Measure A Completed: NOC 11/15/22
16-60 Linwood Ave Pedestrian Improvements
Project Picture
From Lander Avenue to in front of Cunningham Elementary School Measure L / Measure A / Federal Grant Completed: NOC 9/13/22
18-53 Intersection Improvements at Monte Vista and Fosberg Rd
Project Picture
Traffic signal and median at intersection of Monte Vista Ave and Fosberg Rd Federal Grant / Measure L Completed: NOC 3/8/22
16-57 Intersection Improvements at Denair & Hawkeye
Project Picture
Traffic signal at intersection of Denair Ave and Hawkeye Ave Federal Grant / Measure L Completed: NOC 12/10/19
16-56 Intersection Improvements at Lander Ave and F St
Project Picture
Traffic signal at intersection of Lander Ave and F St Federal Grant / Measure L Completed: NOC 3/8/22
18-54 Intersection Improvements at Tully Rd and Tuolumne Rd Traffic signal at intesection of Tully Rd and Tuolumne Rd Federal Grant / Measure L Completed: NOC 1/11/22
21-018 Washington Rd Bridge Railing Repair Repair damaged bridge railing on Washington Rd. Measure L 2023/24 Construction
20-002 Hedstrom Road Rehabilitation Road rehabilitation between Geer Rd. to Colorado Ave. Federal Grant / Measure L Completed: NOC 9/27/22
20-003 Northeast Quadrant Road Rehabilitation
Project Picture
Slurry seal treatment for street segments listed below:
  • N. Olive Ave,
  • E. Hawkeye to E. Minnesota,
  • North Ave,
  • North Highlands Ave,
  • Strathaven Ct,
  • Lock Lomond Ct,
  • Glenhaven Ct,
  • Riviera Way,
  • Rice Ave,
  • Rockford Way,
  • Greenboro St,
  • Robbin Way,
  •  
  • Tammi Way,
  • Dawn Way,
  • Sherri Way,
  • N. Denair Ave.,
  • North Ave. to 300’ north of E. Hawkeye Ave.
Measure L Completed: NOC 8/20/21
21-018 Lander Ave Rehabilitation
Project Picture
Road rehabilitation between D Street to SR-99 Measure L / Fund 420 Complete; NOC 10/24/2023
20-038 Signal Coordination (W. Monte Vista, Golden State, Geer Rd) Replaces and installs new traffic signal controllers that can operate an efficient signal timing plan. Federal Grant / Measure L In Construction
22-005 Traffic Signal Synchronization on E. Monte Vista Ave Replaces and installs new traffic signal controllers that can operate an efficient signal timing plan. Federal Grant / Measure L In Construction
21-021 Pedras Road Rehabilitation Road rehabilitatoin between Geer Rd. to Golden State Blvd. Measure L / Federal Grant 2023/24 Construction
14-44 Intersection Improvements at Main and Tegner Rd Traffic signal at intersection of W. Main St and Tegner Rd Measure L 2022/23/24 Design
20-038 Southwest Quadrant Road Rehabilitation "Street segments are listed below:
  • Alaska St., from West Main St. to Flower St.
  • West Ave., North from West Main St. to Park St.
  • Florence St., from West Ave. North to Grant St.
  • Sunnyside St., from Vermont Ave. to Spruce St.
  • S. Orange St., from Castor Ave. to South Ave."
Measure L 2023/24 Construction
21-022 Road Rehabilitation Adjacent to County Islands "County-led road rehabilitation project in select county islands adjacent to the City’s public right of way, as listed below:
  • S. Soderquist Rd.,
  • 200’ south of Parnell Ave.to end,
  • West Ave S.,
  • Jordan Ave. to Montana Ave.,
  • Jordan Ave.,
  • West Ave S to end,
  • Bernell Ave.,
  • Martinez St. to S. Orange St.,
  • S. Orange St.,
  • Bernell Ave. to 100’ north of Lewis St.
  • 9th St.,
  • Rockwood Ave to 300’ south of Elmwood Ct.
  • Bothun Rd.,
  • East Ave. to Alpha Rd.
  • N. Daubenberger Rd., E Hawkeye Ave to 200’ south of Volk Ave.
  • N. Daubenberger Rd., 200’ south of Volk Ave. to 670’ north of East Ave.
  • N. Mitchell Ave., Wayside Dr. to Starr Ave."
Federal Grant / Measure L Complete


For questions about Measure L Projects, please contact:

Engineering Division
156 S. Broadway, Ste. 150
Turlock, CA 95380
(209) 668-5520
engineering@turlock.ca.us
Monday - Friday, 8AM - 5PM






Icons made by Freepik from www.flaticon.com is licensed by CC 3.0 BY



Top